120 Braley Rd. P.O. Box 429 East Freetown, MA 02717-0429 www.htproduc
10 LP- 205 REV. 3.28.14 Failure of boiler or components due
11 LP- 205 REV. 3.28.14 Figure 2 – Specifications and Dimen
12 LP- 205 REV. 3.28.14 C. CLEARANCES FOR SERVICE ACCESS See
13 LP- 205 REV. 3.28.14 PRODUCTS TO AVOID AREAS LIKELY TO H
14 LP- 205 REV. 3.28.14 H. UNCRATING AND MOVING BOILER Uncr
15 LP- 205 REV. 3.28.14 B. RELIEF VALVE Connect discharge
16 LP- 205 REV. 3.28.14 3. Connect the expansion tank to th
17 LP- 205 REV. 3.28.14 4. Install a back flow preventer on
18 LP- 205 REV. 3.28.14 The chart below represents the combi
19 LP- 205 REV. 3.28.14 I. FREEZE PROTECTION FLUIDS Use onl
2 LP- 205 REV. 3.28.14 IF THE INFORMATION IN THIS MANUAL I
20 LP- 205 REV. 3.28.14 M. BOILER PIPING DETAILS Figure 8 –
21 LP- 205 REV. 3.28.14 Figure 9 – Cascade Multiple Boilers
22 LP- 205 REV. 3.28.14 Figure 10 – Single Boiler Space Hea
23 LP- 205 REV. 3.28.14 Figure 11 – Cascaded Boilers – Spac
24 LP- 205 REV. 3.28.14 A. GENERAL This boiler is certified
25 LP- 205 REV. 3.28.14 The air inlet and exhaust comp
26 LP- 205 REV. 3.28.14 Figure 12 D. EXHAUST VENT AND INTAK
27 LP- 205 REV. 3.28.14 When adjacent to a public walkway
28 LP- 205 REV. 3.28.14 Figure 13 – Condensate Piping NOTE:
29 LP- 205 REV. 3.28.14 The condensate line must remain uno
3 LP- 205 REV. 3.28.14 The following defined terms are use
30 LP- 205 REV. 3.28.14 4. Ensure the vent is located where
31 LP- 205 REV. 3.28.14 I. SIDEWALL VENTING DIAGRAMS Figur
32 LP- 205 REV. 3.28.14 Figure 16 – Sidewall Venting with T
33 LP- 205 REV. 3.28.14 J. VERTICAL VENTING DIAGRAMS Figur
34 LP- 205 REV. 3.28.14 Figure 18 – Roof and Sidewall Venti
35 LP- 205 REV. 3.28.14 PART 6 – GAS PIPING FAILURE TO FOL
36 LP- 205 REV. 3.28.14 Never use an open flame (match or
37 LP- 205 REV. 3.28.14 The gas piping must be sized for th
38 LP- 205 REV. 3.28.14 Figure 21 – Mod Con 850 Gas Valve
39 LP- 205 REV. 3.28.14 PART 7 – FIELD WIRING ELECTRICAL S
4 LP- 205 REV. 3.28.14 The latest version of the National E
40 LP- 205 REV. 3.28.14 D. ALARM CONNECTIONS The Mod Con con
41 LP- 205 REV. 3.28.14 1. The boiler will operate an indire
42 LP- 205 REV. 3.28.14 7. Once into the control box, attac
43 LP- 205 REV. 3.28.14 Figure 24 Figure 25 – Cascade Resi
44 LP- 205 REV. 3.28.14 7. Connect the outdoor sensor (if us
45 LP- 205 REV. 3.28.14 Figure 26 – Mod Con Cascade Master
46 LP- 205 REV. 3.28.14 Figure 27 – Mod Con Internal Connec
47 LP- 205 REV. 3.28.14 PART 8 – START-UP PREPARATION Thoro
48 LP- 205 REV. 3.28.14 B. FREEZE PROTECTION (WHEN USED) NE
49 LP- 205 REV. 3.28.14 good indicators that air is removed
5 LP- 205 REV. 3.28.14 PART 4 – BOILER PIPING ...
50 LP- 205 REV. 3.28.14 4. Verify electrical connections ar
51 LP- 205 REV. 3.28.14 PART 9 – START-UP PROCEDURE FOR YOU
52 LP- 205 REV. 3.28.14 Function Display Press {S3} once Bo
53 LP- 205 REV. 3.28.14 D. TEST MODE This function is intend
54 LP- 205 REV. 3.28.14 6 0 min. Changes the indirect circul
55 LP- 205 REV. 3.28.14 30 0 Parameter set on 0 = There will
56 LP- 205 REV. 3.28.14 Table 14 PART 11 – TROUBLESHOOTING
57 LP- 205 REV. 3.28.14 DO NOT USE THIS APPLIANCE IF ANY P
58 LP- 205 REV. 3.28.14 F01 ECO circuit 2 Vent temperature H
59 LP- 205 REV. 3.28.14 Figure 29 PART 12 – MAINTENANCE In
6 LP- 205 REV. 3.28.14 J. OPTIONAL HIGH GAS PRESSURE SWITCH
60 LP- 205 REV. 3.28.14 The combustion chamber insulation i
61 LP- 205 REV. 3.28.14 c. Replace and tighten the (6) 10 mm
62 LP- 205 REV. 3.28.14 Figure 31
63 LP- 205 REV. 3.28.14 Figure 32
64 LP- 205 REV. 3.28.14 Figure 33 – NOTE: Ceramic Refractor
65 LP- 205 REV. 3.28.14 Figure 34 – LP-205-H
66 LP- 205 REV. 3.28.14 Figure 35
67 LP- 205 REV. 3.28.14 BOILER START-UP REPORT LIGHT OFF ACT
68 LP- 205 REV. 3.28.14 INSPECTION ACTIVITIES DATE LAST COMP
69 LP- 205 REV. 3.28.14
7 LP- 205 REV. 3.28.14 PART 1 – GENERAL SAFETY INFORMATION A
70 LP- 205 REV. 3.28.14
71 LP- 205 REV. 3.28.14 MAINTENANCE NOTES
72 LP- 205 REV. 3.28.14 HTP CUSTOMER INSTALLATION RECORD
8 LP- 205 REV. 3.28.14 F. BOILER WATER Do not use petrole
9 LP- 205 REV. 3.28.14 Gas Valve – Senses suction from the b